New Engineer Works and Solution

Within tightly constrained world we, STRUCT-MAST ENGINEERS managed to stand out, offering perhaps the best engineering contribution that the situation allowed in respect of material, efficiency of operations and quality of construction. The method of statement definitely has proved radical enough to transform the result. We strive hard to help our customers to achieve better product and apt solutions. We encourage the Client for their input and have continuous dialogue with the consultants, manufacturer, field personnel, and providing the resources and support necessary to bring valuable and timely solutions to puzzling problems. Our signature is witnessed by our various clients for whom we offered various engineering solutions to the Client. An apt approach system to the work place is an art and effective way to accomplish works economically with fast progress. We took a lead, developed the innovative platforms as per the need of the job. These platforms have helped us to generate confidence and safety culture. More about platforms refer:

A. Engineering Constructions – Reinforced Concrete Structures:

Silo
We as Struct-Mast Engineers undertake silo construction using slip-forms with all related foundations and structural works any where in India. To facilitate faster progress we modified our slip forming system to carry the roof girders along with the slip forming operations which proved radical change towards betterment in terms of quality and faster progress.

Overhead Reservoir
We undertake construction of overhead large reservoir for community water supply . We have provided such reservoir as per shape of cup and saucer with very good form finished surface needing no other renderings with mortar.

Sub-station
We undertake construction of electrical substation for power house involving all civil, reinforced concrete structures, foundations, trenches, pre-cast slabs, false floors, false ceiling, partitions, joineries like UPVC windows, decorative doors, plumbing works, drainage works, waterproofing works of terraces, chhajjas, toilet blocks etc. The unseasonal heavy rain coupled with sub-soil strata which were weak in shear and loosely filled, depth of trench being more than 3.0 M caused sliding of slopes. The proximity of the excavation to existing boundary walls and slum dwellings co-existing just touching the wall had threatened stability of entire excavated pit and also serious security. The excavation slope were stabilised by introducing sand wick drain around the pit inter connected and dewater the sump prepared and designed for the purpose. This scheme saved cost of costly soil retaining piles and could achieve faster progress.

Bio-technology laboratory building
We undertake construction of Bio-technology laboratory building needing stringent hygienic standards, construction standards pertaining to measures to curb dust, synchronization of humidity, air-conditioning of entire building, nature of energy savers, providing separate floors for maintenance of various facility namely power, A.C. etc.

B. Engineering Constructions – Steel Structures

Walkway
We undertook fabrication and erection of walkway to connect the building at two different floors. The span length of walkway was about 24 meter. The building has basement and the floor slab will not allow wheel load more than 24 MT. The main "N" girders supporting walkway and floor was weighing 32 MT. The compound was housing corporate offices restricting practically no fabrication work can be peromitted during office hours. The walway was fabricated in two parts in casting yard and brought to site using mini crane namely HYDRA. Both the parts were assembled at ground level and lifted up using manual winch there by restricting load very much below 24 MT all through out the erection work.
Stadium
Industrial structure
Under slung crane girders
Special purpose structures for strengthening