Infrastructre
| H.O.T CARNE 5T | 2 Nos. | ||
| H.O.T CARNE 2T | 7 Nos. | ||
| H.O.T CARNE 1T | 1 Nos. | ||
| HYDROLIC TROLLY | 2 Nos. | ||
| MECHANICAL TROLLY | 6 Nos. |
LAB FACILITY & INSPECTION TESTING
Chemical analysis lab for hot dip galvanizing
| Coating thickness measurement - digital coat meter | 3 Nos. | ||
| Vernear calipers | 1 Nos. | ||
| Dial vernear calipers | 2 Nos. | ||
| Hammer Tester | 1 Nos. | ||
| W.F.T. Guage | 1 Nos. | ||
| Humidity Measuring Instrument | 1 Nos. | ||
| Porosity Meter (holiday detector) | 1 Nos. | ||
| Adhesive Tester | 1 Nos. | ||
| Profile Guage | 1 Nos. | ||
| Micrometer | 4 Nos. |
The hot dip galvanizing plant is running on L.D.O
| Having the man power | 60 Nos. | ||
| Plant capacity | |||
| Shot blasting | 20 lack sq ft/month. | ||
| Zinc spray | 18 lack sq ft/month. | ||
| Liquid painting | 50 lack sq ft/month. | ||
| Hot dip galvanizing | 800 MT/month | ||
| Fabrication | 500 MT/month |

