SEWAGE PUMPS( HES )

SUBMERSIBLE SEWAGE PUMPS ( HES )

Automatic Guide Rail System

A bracket is provided at the discharge side of the pump, At the center of the bracket a rubber ring is mounted .A pedestal is fixed to the bottom of the plate by foundation bolts,winch are grouted. The pump is lowered into the pit through a guide rail pipe.On reaching the pedestal the bracket engages into the pedestal and the rubber ring prevent leakage of water. The pump can be lifted back by pulling it out without removal of any nuts or bolts.